Opinion and Order Affirming the Decision of the Almer Charter Township Board of Trustees 

Author:  | Law, Michigan, Noise, Ordinances

On February 15, 2017, Plaintiff Tuscola Wind III, LLC, (“Tuscola”) filed a complaint naming the Almer Charter Township and that Township’s Board of Trustees as Defendants. Count One of the Complaint is the “Claim of Appeal.” Tuscola Wind’s claims arise out of Defendants’ denial of a Special Land Use Permit (“SLUP”) that would have permitted Tuscola Wind to construct the “Tuscola III Wind Energy Center” in Tuscola County, Michigan. Oral argument on the claim of appeal was held on October 5, 2017. For the following reasons, the Board of Trustee’s denial of the SLUP will be affirmed. …

The Zoning Ordinance addresses noise emissions from the turbines:

Noise emissions from the operations of a [Wind Energy Conversion System] shall not exceed forty-five (45) decibels on the dBA scale as measured at the nearest property line of a non-participating property owner or road. A baseline noise emission study of the proposed site and impact upon all areas within one mile of the proposed WECS location must be done (at the applicant’s cost) prior to any placement of a WECS and submitted to the Township. The applicant must also provide estimated noise levels to property lines at the time of a Special Use application.

Similarly, “[a]ll efforts shall be made not to affect any resident with any strobe effect or shadow flicker.” And the Zoning Ordinance provides the general admonishment that “[t]he wind energy conversion system shall not be unreasonably injurious to the public health and safety or to the health and safety of occupants of nearby properties.”

On September 23, 2016, Tuscola submitted its SLUP application to the Almer Township Planning Commission. …

To assist in its consideration of the application, the Township retained the Spicer Group, Inc., an engineering consulting firm. On October 25, 2016, the Spicer Group sent Tuscola an email requesting clarification and/or additional information regarding several aspects of the application. Three of the Spicer Group’s concerns are relevant. First, Spicer questioned several aspects of the sound emissions report, including how Tuscola chose the 1-hour LEQ as the proper metric. The Spicer Group further asked when Tuscola would be submitting an economic impact study, indicating concern that “the property value information provided on pages 10 through 11 of the TW3 SUP Application is not local and not pertinent to Almer Township.” Finally, the Spicer Group indicated that Tuscola’s proposal to place the power lines above the ground did not conform with the Zoning Ordinance requirement that all electrical connection systems and lines from a wind farm be placed underground. The Spicer Group acknowledged that the Planning Commission has discretion to waive that requirement, but suggested that Tuscola had not yet sought that waiver.

Tuscola responded to the Spicer Group’s inquiries on October 31, 2016. …

On November 8, 2016, the Spicer Group submitted a report to the Planning Commission analyzing Tuscola’s SLUP application. In the report, the Spicer Group concluded that Tuscola had complied with many, indeed most, of the Zoning Ordinance’s requirements. But the Spicer Group did identify a number of outstanding issues. …

On November 10, 2016, the Planning Commission held a public hearing to discuss the SLUP application. At the hearing, a representative from Tuscola discussed the project. … For the rest of the hearing, members of the community expressed their opinions on the proposals. Most speakers communicated objections to various aspects of the application (if not the project as a whole), but some expressed support for the wind energy project. Two sound engineers testified at the hearing. The first engineer, Rick James, is an employee of e-Coustic Solutions and was hired by concerned citizens. First, Mr. James opined that Tuscola’s noise emissions report likely understated the dBA level at several property lines. Second, Mr. James challenged Tuscola’s assertion that the noise emissions provision in the Zoning Ordinance allowed for an averaged sound level measurement, as opposed to a maximum level: “[T]he words are very explicit, they say, ‘Shall not exceed 45 dBA.’ When you read law you can’t read into it when the words aren’t there. It doesn’t say 45 dBA Leq, it does not say 45 dBA average, it says not exceed 45 dBA.” Id. at 109. Ms. Kerrie Standlee, the principle engineer for Acoustics by Design [Acoustics by Design was retained by the Township to assist in reviewing the application], also testified. Ms. Standlee concurred with Mr. James’s interpretation of the ordinance:

[T]he limit is stated in there that the level shall not exceed 45 dBA. It doesn’t give any descriptor, is it supposed to be the Lmax or – and as was mentioned, an L90 or an L10 at 50, an Leq, it doesn’t specify. Mr. James is correct in that when something is not specified, you take the normal interpretation, which would be Lmax. I’m with – I’m on the City of Portland Noise Review Board and we have an Lmax standard. It’s not specified as the Lmax it’s just – like yours it says it shall not exceed this level. And that is an absolute level, not – not an equivalent energy level.

Ultimately, the Planning Commission concluded that additional information was necessary before the SLUP application could be ruled upon. …

The day after the public hearing, Tuscola sent the Planning Commission a response addressing several of the concerns raised by the Spicer Group. …

Several days later, Tuscola sent another communication to the Planning Commission further addressing several of the issues identified by the Spicer Group. …

On November 17, 2016, the Almer Township Board approved a “Wind Energy Conversion Systems Moratorium Ordinance.” … Thus, the Board enacted a

moratorium, on a temporary basis, on the establishment, placement, construction, enlargement, and/or erection of Wind Energy Conversion Systems within the Township and on the issuance of any and all permits, licenses or approvals for any property subject to the Township’s Zoning Ordinance for the establishment or use of Wind Energy Conversion Systems. … [T]his Ordinance shall apply to any applications pending before any Township board or commission, including the Township Board, Planning Commission or Zoning Board of Appeals.

… On December 7, 2016, the Planning Commission held a second public hearing. … In large part, the Tuscola representative summarized the company’s November 15, 2016, submission to the Planning Commission. … The Planning Commission discussed the outstanding issues, and … [t]he Township’s attorney summarized the requested information as follows: “[Y]ou want to request information from NextEra on property values, noise, sound models based on Lmax and if there is the justification you just referenced regarding the cost estimate on the decommissioning of the individual towers.”

On December 22, 2016, Tuscola provided the supplemental information which the Planning Commission had requested. … On December 29, 2016, the Spicer Group responded to Tuscola’s supplemental memorandum. … On January 3, 2017, Tuscola’s representative sent a letter to the Planning Commission addressing the Spicer Group’s memorandum. …

On January 4, 2017, the Planning Commission held its third and final public hearing on the SLUP application. … Planning Commission member Daniels moved to recommend denial of the SLUP application. … He asserted that “[t]he ordinance does not allow for the averaging varying levels of sound. We, as a Planning Commission, are not here to rewrite the ordinance, but to enforce the ordinance as written. And it mandates a maximum sound level of 45 decibels.” …

Ultimately, the Planning Commission voted 3 to 1 to recommend denial of the SLUP application (two members did not vote because of a conflict of interest).

On January 17, 2017, the Almer Township Board held a public meeting to review the Planning Commission’s recommendation regarding the SLUP application. … The Board simultaneously issued a Resolution articulating its rationale for denying the SLUP application. In the Resolution, the Board identified five areas in which the SLUP application did not comply with the Zoning Ordinance. … Finally, the Board noted that it had previously approved a moratorium on wind energy projects in the Township and thus was precluded from approving the SLUP application even if it had complied with the Zoning Ordinance. …


Tuscola argues each of the Board’s purported reasons for denying the SLUP application were contrary to Michigan law and not supported by substantial evidence. Tuscola further argues that the Board did not have the authority to enact a moratorium on wind energy projects in the did not appeal from a final decision of the Township. For its part, the Township argues that Tuscola’s appeal is not ripe because the company did not appeal from a final decision of the Township. Next, the Township argues that each of the Board’s expressed reasons for denying the SLUP application were reasonable and permitted by law. And, finally, the Township argues that the temporary moratorium on wind energy project permits was valid. …

A. The denial of the SLUP application is ripe for review.

(Although the moratorium on wind energy projects was enacted after Tuscola’s SLUP application was submitted (but before it was rejected), the Planning Commission and Township Board proceeded to consider the SLUP application on its merits. At most, the Township Board relied upon the moratorium as an alternative (and secondary) basis for denying the SLUP application. Because the Board’s denial of the application was supported by substantial evidence and was not contrary to law, the legitimacy of the moratorium need not be resolved.)

B. Michigan Courts have repeatedly confirmed that courts should defer to municipal interpretations of zoning ordinances. … Thus, this Court does not sit in de novo review of the Zoning Ordinance provision regarding noise emission levels (assuming that the ordinance is ambiguous). Rather, the question is whether the Township Board’s interpretation of the ordinance was “reasonable.” … The “[s]hall not exceed” language in § 1522(C)(14) is facially indistinguishable from a Lmax standard. … Even if the Court were to conclude that § 1522(C)(14) is ambiguous regarding how to measure sound emissions (and not just ambiguous regarding the length of time over which to measure them), Tuscola’s argument still falls short. …

Tuscola’s final argument regarding § 1522(C)(14) is that the Township Board’s interpretation would result in exclusionary zoning,* which is prohibited by Michigan law. Specifically, Tuscola argues that “[u]sing an Lmax metric would make development of commercial wind energy in the Township impossible because a single wind turbine could not be sited within at least a half-mile of a nonparticipating line.” This conclusory argument has no merit. Under Michigan, “a zoning ordinance may not totally exclude a land use where (1) there is a demonstrated need for that land use in the township or surrounding area, (2) the use is appropriate for the location, and (3) the use is lawful.” Even assuming that the Township Board’s interpretation of the ordinance completely excludes wind energy development in the Township, Tuscola cannot prevail.

(*And that assumption is questionable. Tuscola asserts that application of an Lmax standard would prevent the company from siting a turbine within 2,775 feet from a nonparticipating property line. See Dec. 22, 2016, Supp. Info. at 1. Thus, Tuscola would be forced to reach agreements with a significantly larger number of property owners in order to build the turbines as currently planned. But it seems plausible that Tuscola might be able to enter into more land use contracts with property owners and/or site a fewer number of turbines in Almer Township. Both of those alternatives would undoubtedly impact the profitability of the project, but Tuscola has not demonstrated that it is entitled to deferential or economically favorable conditions. Perhaps application of an Lmax standard creates such an economic hardship that it constitutes de facto exclusionary zoning. But Tuscola’s conclusory briefing on this point falls far short of showing that to be true.)

Tuscola has made no attempt to show that there is a “demonstrated public need” for wind turbines in Almer Township, and the Court cannot comprehend why such a need would exist. “Presumably any entrepreneur seeking to use land for a particular purpose does so because of its perception that a demand exists for that use. To equate such a self-serving demand analysis with the ‘demonstrated need’ required by the statute would render that language mere surplusage or nugatory, in contravention of usual principles of construction.” Outdoor Sys., Inc. v. City of Clawson. Further, “the public need must be more than mere convenience to the residents of the community.” DF Land Dev., LLC v. Charter Twp. of Ann Arbor.

Wind turbines produce energy, which is, of course, needed by the Almer Township community. But Tuscola cannot reasonably argue that the Township will have inadequate access to energy absent the wind energy project. The Michigan Court of Appeals has explained that, to show demonstrated public need, the plaintiff must do more than show that “residents of the township would benefit from” the excluded use. Tuscola has not carried that burden here.

C. The Township Board reasonably interpreted its Zoning Ordinance and, under that reasonable interpretation, Tuscola was undisputedly in noncompliance with the Zoning Ordinance. Because at least one of the bases on which the Board premised its denial was lawful, the remaining four bases need not be examined. The Township Board’s denial will be affirmed.

Accordingly, it is ORDERED that Defendant Almer Township Board’s denial of Plaintiff Tuscola Wind III, LLC’s, SLUP application is AFFIRMED.

Dated: November 3, 2017

THOMAS L. LUDINGTON
United States District Judge

Case No. 17-cv-10497
United States District Court
Eastern District of Michigan
Northern Division

Download original document: “Tuscola Wind III, LLC,, Plaintiffs, v Almer Charter Township, et al, Defendants

This material is the work of the author(s) indicated. Any opinions expressed in it are not necessarily those of National Wind Watch.

The copyright of this material resides with the author(s). As part of its noncommercial educational effort to present the environmental, social, scientific, and economic issues of large-scale wind power development to a global audience seeking such information, National Wind Watch endeavors to observe “fair use” as provided for in section 107 of U.S. Copyright Law and similar “fair dealing” provisions of the copyright laws of other nations. Queries e-mail.

Wind Watch relies entirely
on User Funding
   Donate via Paypal
(via Paypal)
Donate via Stripe
(via Stripe)

Share:

e-mail X FB LI M TG TS G Share

Get the Facts
CONTACT DONATE PRIVACY ABOUT SEARCH
© National Wind Watch, Inc.
Use of copyrighted material adheres to Fair Use.
"Wind Watch" is a registered trademark.

 Follow:

Wind Watch on X Wind Watch on Facebook Wind Watch on Linked In

Wind Watch on Mastodon Wind Watch on Truth Social

Wind Watch on Gab Wind Watch on Bluesky